Implementation of The Program Evaluation and Review Technique (Pert) Method To Determine Estimate Time of Project Completion


Peneliti

Sufa atin, S.T, M.Kom Irawan Afrianto, S.T, M.T

Deskripsi/Abstrak

One of the causes of failure in a project is the project completion time that exceeds a predetermined time limit. The purpose of this study is to assist the project manager in making a project schedule, when the project starts and when the project is finished and how long it takes to complete the project. In addition, the purpose of this study is to be able to compare the implementation time in the field using existing methods. as well as what actions must be taken if there are obstacles in the project. One method that can be used to analyze the time used to complete a project is the Program Evaluation and Review Technique (PERT) method. PERT is a method that has 3 time durations namely optimistic, most likely and pessimistic time. PERT can also provide information about the project completion period, before the specified date, the critical path that has an impact on the project completion time. The result of this research is to assist the project manager in determining how long it will take to implement the project and to know which work is considered critical (work that cannot be postponed) so that any obstacles can be overcome so that the project can be completed on time

Publikasi

JudulJenisMediaTahun

Data Publikasi Tidak Tersedia

Detail Penelitian

Program Studi: TEKNIK INFORMATIKA - S1
Tingkat:Internasional
Jenis Litabmas:Penelitian Dasar
Skim Litabmas:-
Kategori Bidang Litabmas:Engineering and Technology
Bidang Litabmas:Other Engineering and Tehcnology
Kategori Tujuan Sosial Ekonomi:Information and Communication Services
Tujuan Sosial Ekonomi:Other
Kelompok Bidang:Teknik Informatika
Tahun Usulan:2021
Tahun Pelaksanaan:2021
Tahun Pelaksanaan Ke-:1
Tahun Kegiatan:2021
Lama Kegiatan (dalam tahun):1
Lokasi Kegiatan:-