Bread Factory Layout Design Using BLOCPLAN
Peneliti
Julian Robecca, S.T. M.T Alam Santosa, S.T, M.T
Deskripsi/Abstrak
The aim of this research is to design a proposed layout for bread production facilities that can minimize the moving distance and material handling costs. The layout design method is the BLOCPLAN method. The BLOCPLAN method is a facility layout design method based on a hybrid algorithm and supported by the BLOCPLAN 90 . With this method, 20 alternative layouts are obtained, then the researcher chooses 3 layouts that had the greatest proximity value. Layout 13 produced a smaller total displacement distance and material handling costs, namely 56.40 meters at a cost of 489.62 rupiah, in one transfer of raw material . The initial layout of the bakery factory had a displacement distance of 68 meters and a material handling cost of 590.28 rupiah in one transfer of raw material. For this reason, layout 13 becomes a proposed layout for use by a bread production facility. In addition, the layout of the bread production facilities and production time can also be more efficient than before.
Publikasi
Judul | Jenis | Media | Tahun |
---|---|---|---|
Data Publikasi Tidak Tersedia |
Detail Penelitian
Program Studi | : | TEKNIK INDUSTRI - S1 |
---|---|---|
Tingkat | : | Internasional |
Jenis Litabmas | : | Penelitian Terapan |
Skim Litabmas | : | - |
Kategori Bidang Litabmas | : | Engineering and Technology |
Bidang Litabmas | : | Manufacturing Engineering |
Kategori Tujuan Sosial Ekonomi | : | Manufacturing |
Tujuan Sosial Ekonomi | : | - |
Kelompok Bidang | : | - |
Tahun Usulan | : | 2021 |
Tahun Pelaksanaan | : | - |
Tahun Pelaksanaan Ke- | : | 1 |
Tahun Kegiatan | : | - |
Lama Kegiatan (dalam tahun) | : | |
Lokasi Kegiatan | : | - |